-Typical construction process introduction-

The construction requirements

Construction environment: above 5 degrees Celsius, the air humidity is recommended to be less than 60%, the wind speed is not more than 5, the surface of the base is dry, and open water is strictly prohibited.

Construction equipment: control equipment heating, pressurization, mixing ratio, spray gun mixing chamber and gun nozzle.

Construction personnel: pay attention to whether the equipment is abnormal in time, maintain the equipment and clean the spray gun in time after the construction every day.
Control the flatness and thickness of spraying, control the amount of material and reduce non-construction losses. When spraying, deal with the abnormal situation of the base layer in time, such as the primer is not dry, the primer ratio is not accurate and solid debris/liquid contamination.

Accurate primer ratio, air drying and base drying during construction. When it is not completely dry after construction, it is necessary to repair the primer before spraying polyurea.

◇ Concrete base construction process

Picture Name

Base course treatment and special mortar repair

Picture Name
Picture Name

Base cleaning

Picture Name
Picture Name

Polymer cement mortar batch scraping

Picture Name
Picture Name

Base Coating

Picture Name
Picture Name

Spraying polyurea waterproof layer

Picture Name
Picture Name

Weatherproof topcoat brushing

Picture Name
Picture Name

Water storage test

Picture Name